FENCING AND SEAWALL CONSTRUCTION

Sea Wall and Fancing Construction Casa Alexandria

Fencing and Seawall Construction

With the cottage complete and turned over to the client, we have turned our attention to the seawall construction, CHB wall, fencing and other site development work. We started by submitting our design to the necessary authorities in order to obtain the proper permits including an ECC (Environmental Compliance Certificate).

With the proper permits in hand, we began construction of the main concrete hollow block wall by excavating and building our footings and column. After the columns were complete, we moved onto the wall footing over which we started to lay the hollow blocks. The last step was cement parging or “rendering of the whole wall structure. Upon completion of the rendering we started to apply primer and elastomeric paint.

For the seawall, we excavated approximately 2 meters deep, then formed an engineered rip rap wall with boulders and cement. Within that wall we set our galvanized iron fence posts which would serve as our vertical supports for the wrought iron rail and pickets.

We are in the last stages of completion of the seawall construction, and are currently back-filling and leveling the site. The final part of the process will be to fabricate all the gates and finish painting.

Read More

SEMI DETACHED HOME CONSTRUCTION UPDATE – FEB 15TH

home construction update feb 15th - dauin duplex

Home Construction Update Feb 15th – Dauin Semi-Detached Duplex

We started home construction of this 2 story 2 unit semi-detached house in late January, and things are going well so far.

After laying out the building, we dug appropriately 1 1/2 meters down to start our footings and foundations. Being on sandy soil, we went a little deeper than normal, beefed up all our structural pads and columns and incorporated tie-beams into the building base.

Once the footings were in we proceeded to the columns and at the same time laid out all our necessary plumbing roughing on the first floor. We then put in the proper steel matting for the floor and poured our slabs.

We are now working on the forming for the second floor beams.

 